缓冲对于吸收关键链中的不确定性起到重要作用,而项目团队效能的阶段性特征以及不稳定的动态变化给缓冲设置带来诸多不确定性问题。提出了一种考虑项目团队效能的动态缓冲设置方法,该方法通过评估项目团队动态效能,设定项目团队效能调整系数,对缓冲进行动态设置,使缓冲更具针对性和灵活性。通过算例介绍了该方法的使用过程,并通过MATLAB模拟证实了该方法的有效性和实用性。
Abstract:Buffer plays an important role to absorb the uncertainty in the critical chain.However,stage characteristics and unstable dynamic changes of the team effectiveness bring various uncertain problems to buffer sizing.A dynamic buffer sizing based on evaluation of project team effectiveness method is proposed to deal with these problems.The method sizes buffer dynamically through evaluating project team effectiveness and setting team effectiveness coefficient,which make the proposed method more realistic and flexible.Finally,a case study is carried out to demonstrate application of the proposed method.And MABTLAB is conducted to validate effectiveness and practicability of the proposed method.
[1]高德拉特,著.罗嘉颖,译.关键链[M].北京:电子工业出版社,2006.
[2]Herroelen W.,Leus R..On the merits and pitfalls ofcritical chain scheduling[J].Journal of Operations Management,2001,19(5):559-577.
[3]Leach L.P.Critical Chain Project Management(Second edition)[M].London:Artech House Inc,2005.
[4]Tukel O.I.,Rom W.O.,Eksioglu S.D..An investigation of buffer sizing techniques in critical chain scheduling[J].European Journal of Operational Research,2006,172(2):401-416.
[5]Rabbani M.,Ghomi S.M.T.,Jolai F.,Lahiji N.S..A new heuristic for resource constrained project scheduling in stochastic networks using critical chain concept[J].European Journal of Operational Research,2007,176(2):794-808.
[6]Blackstone J.H.,Cox J.F.,Schleier J.G..A tutorialon project management from a theory of constraints perspective[J].International Journal of Product Research,2009,47(24):7029-7046.
[7]TUKEL O I,ROM W O,EKSIOGLU S D.An investigation ofbuffer sizing techniques in critical chain scheduling[J].European Journal of Operational Research,2006,172(2):401-416.
[8]杨立熙,李世其,黄夏宝,等.属性相关的关键链计划缓冲设置方法[J].工业工程与管理,2009,14(1):11-14.
[9]林晶晶,周国华.基于工序不确定性的关键链缓冲设置方法研究[J].科技管理研究,2011(2):227-230.
[10]别黎,崔南方.关键链多项目管理中能力约束缓冲大小研究[J].计算机集成制造系统,2011,17(7):1534-1540.
[11]刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386.
[12]褚春超.缓冲估计与关键链项目管理[J].计算机集成制造系统,2008,14(5):1029-1035.
[13]罗伯特·k·威索基.创建有效的项目团队[M].北京:电子工业出版社,2003:111.
[14]WHITE D,FORTUNE J.Current practice in project management:an empirical study[J].International Journal of Project Management,2002,20(1):1-11.
[15]Bandura A.Self-Effieaey:The Exereise of Control[M].NewYork:WH Freeman&CojnPany,1997.
[16]Nadler D.A.Haekmanetal.Managing Organizationa1Behavior[M].Boston,MA:Little,Brown,andCo,1979.
[17]杨宁.项目团队效能的过程分析与评估方法研究[D].大连:大连理工大学,2010.
基本信息:
DOI:
中图分类号:F253
引用信息:
[1]刘德金,段鹰,李潇.基于项目团队效能评估的关键链动态缓冲设置研究[J].机械,2013,40(09):22-27.
基金信息:
中央高校基本科研业务费科研专项自然科学类面上项目(CDJZR10110020)